LD Inspections

Edit Answers
RRNMAGOJWRUJSQWBMLYB IZQHNWMVLPOCDIIBQWYL LCGKTAOEMCSQSZZRNHGA TGVYSJCONTRACTORRTBS CONTRACTORSPROPOSALO PDIJOZHKJANCKOUSRJHP ZVDYCCLQFDMWROYTQAMO VINSPECTIONTDRVNUDRR AWAVZFHRBOTDQVEIREQP FOTAFUDDREJUIANREZKS GVZAQAMQMPWGWUDPWIMR CONFIRMATIONEBOEORKO INSPECTIONSTABRURAXT DRXKVDFCZMUTRCWLRTAC DIFMHDIPDIMYHJEBOOKA GKAQEVDQZPFPLTBTBNRR IOTGQBFERXAHVASBTDJT CBMKCWRJSTHAUKINDEPN TBUGPGQORCAKXETHVHMO JLWTQEVUWXXUZZEUCCFC
1.
To add the inspection to the Module, you go to the __________ ___ on the sidebar.
2.
For draws after the initial draw, an ___ report may be needed.
3.
Click the ___ ___ link to order the inspection on the inspection company’s website.
4.
If an adjuster's report isn't available for the claim, what can we look for instead?
5.
If the claim is a Total Loss and the bwr is not using the original foundation, the inspections will require both ___ and contractor’s proposal.
6.
The Inspection vendor contacts the borrower to schedule an appointment.
7.
Inspection results from ___ takes up to 7 business days.
8.
Must attach the ___ ___ if the AR is not available when ordering the inspection.
9.
What do we call the person whose name and number is provided to the inspection company? (Abbr)
10.
Who signs the waiver of lien?
11.
Along with the POC name & phone number, what else should be included in your inspection note in the module?
12.
The waiver of lien does not need to be ________.