KBS Finals Review

Edit Answers
FSHIPPINGNDZ KLJIQUCFFWDI XXAWDOOFZEAS MDONCTPZYWFI QFENGCLNPITX ZWPTPEPBQQCT DGCPAHBFRWNE SNXMKIRRWIEE MBKUHRLOAXWN UXPWCZCEFCST MFUHWAHBRGEH COLDFORMZMBT
1.
The 1 or 2 on the Design Cross Section.
2.
The Purlin Clip type with no stiffeners.
3.
The type of material that 80S0105 indicates.
4.
How much do we oversize holes for standard bolts?
5.
The Assembly Prefix for a Built-up Rigid Column.
6.
A Double sided Fillet weld.
7.
The first TM in the project order flow.
8.
The Fourth TM in the project order flow.
9.
The last TM in the project order flow.